Program Overview Industrial Related Links |
Engineering Design Report GuidanceIndustrial Wastewater Systems Plan ReviewA proposal for a new or modified wastewater treatment system for industrial wastewater must be submitted to the Wisconsin Department of Natural resources for approval, prior to the start of construction. And prior to developing the plans and specifications, the Department recommends the submittal of a preliminary plan that generally describes the anticipated wastewater treatment method. The review of the preliminary plan will enable the system owner to obtain initial feedback from the Department on the overall reasonableness of the proposal with regard to state regulations and water quality protection goals. This early consultation may save time and money in the long run. A complete submittal of construction plans to WDNR for a proposed new or modified wastewater system for industrial wastewater must contain an engineering design report in addition to the treatment system plan drawings, and specifications. The engineering report should contain at a minimum, the following:
The plan drawings should include:
The specifications should include:
Depending upon the type of system being proposed additional information may be necessary. Last Revised: Monday August 28 2006
|