Wastewater Facility Plan Report Outline
- Background Information / Existing Conditions
- Need for Proposed Project
- Planning Area
- Environmental Setting
- Demographic and Land Use Information
- Design Criteria
- Design year
- Sewer service area identified
- Infiltration/Inflow Analysis
- Sewer System Evaluation Survey (SSES)
- Projected population, flows, loadings, and toxicity assessment
- Possible discharge locations and effluent limitations
- Alternatives Analysis
- Identification of Alternatives established with consideration of alternative
regionalization schemes, sewer service areas, treatment technologies, facility sites,
and discharge locations.
- Total present worth (Economic) cost analysis
- Environmental impacts of alternative
- User charge (Fiscal) cost analysis
- Recommended alternative
- Public Participation
- Public hearings and/or informational meetings conducted to highlight user charges,
environmental impacts, and any controversial issues
- Consideration of public comments
- Interagency and Intra-Agency Comments
- Conformance with regional plans
- Compliance with other federal, state and local regulations
- Selection of Cost-Effective Alternative
In accordance with s. NR 110.09(1), Wis. Adm. Code, identify the most cost-effective alternative that will result in the minimum total resources costs over the planning period. The total resources costs include monetary costs, environmental and social considerations, and other non-monetary factors.